Parliament Building in the New Administrative Capital is built upon 126000m, it consists of the main building, the service building and the landscape works includes the fences, internal roads and the green areas.
Parliament Building in the New Administrative Capital is built upon 126000m, it consists of the main building, the service building and the landscape works includes the fences, internal roads and the green areas.
The main building is built on 18000m; it comprises a basement, a ground floor, 8 typical floors, a dome with 50m diameter, the main hall accommodates of 1000 member and the administrative offices.
BuildIN carried out strengthening works including carbon fiber wrapping and CFRP laminates installation. We have successfully applied and delivered seven layers of FRP wrapping for reinforced beams in the parliament main hall. In addition to that, some of the openings were strengthened using CFRP laminates.
BuildIN is proud to have actively taken part in the construction of New Administrative Capital, towards a brighter Egyptian future.
We use Fiber Reinforced Polymer (FRP) composite systems to strengthen a wide variety of structures for flexure, shear, axial loads and seismic upgrading.
Get a serviceBUILDIN CONTRACTING is an Egyption based general and specialized construction contractor .